When to Schedule Plastering in a Home Renovation
https://theextensionedit.birchreport.com/posts/when-to-schedule-plastering-in-a-home-renovation
Plastering should be scheduled after all major structural work, plumbing, and electrical rough-ins are complete, but before flooring, cabinetry, and trim details are installed. This ensures walls and ceilings are smooth and ready for final finishes without risking damage to exposed wires or pipes. Timing also depends on room usage—wet areas need additional drying time. The goal is to sequence trades logically to avoid rework and maintain quality.